Articles

Three important road connectivity projects recommended by Network Planning Group (NPG)

Network Planning Group (NPG) constituted under the institutional framework of ‘PM GatiShakti’ has recommended 3 important road connectivity projects.  These are Construction of Four Lane Highway from Gazipur – Ballia – UP/Bihar State Border, Improvement and Up-gradation of Existing Road from 2-Lane to 4–lane in Uttar Pradesh and Moradabad & Kashipur bypasses in UP, Uttarakhand.

All 3 projects are important for the improvement and upgradation of the roadways with a view of multimodality, easier commute, and land acquisition.

As a part of the proposal in the 33rd Meeting of the NPG, 3 critical agendas were discussed and recommendations were made as follows:

  1. Construction of Four Lane Highway from Gazipur – Ballia – UP/Bihar State Border

For better freight flow, and interstate multimodal connectivity in Uttar Pradesh. The proposal was for a  4-lane highway (in greenfield) to connect the economic centers for (Lucknow, Varanasi, Azamgarh, and Mau cities). This will ensure shortest connectivity from south Bihar to Delhi. At Buxer a bridge on river Ganga is being constructed with spur which will enhance connectivity of South Bihar to Delhi The project will reduce travel time between Lucknow – Patna by 3.5 Km/hr for seamless traffic, and interstate connectivity. The highway will serve the Lucknow defense corridor at two points (Banaras and Pruvanchal expressway).

  1. Improvement and Up-gradation of Existing Road from 2-Lane to 4–lane in Uttar Pradesh

The proposal was to make 2 lane roads into 4 lanes for upgradation and improvement of the Roads. The proposal is for 4 – a lane bypass Palia – Shahjahanpur – Hardoi – Lucknow. This project is a part of strategic border roads of Indo – Nepal border road project (INBRP) of Ministry of Home Affairs providing connectivity to Indo – Nepal border and facilitating SSB mobility. It will also ensure connectivity to Bardoi National Park. It will also enhance the freight flow and traffic movement.

  1. Moradabad & Kashipur bypasses in UP, Uttarakhand.

The proposal was for a 4-lane Bypass Project (brownfield) for decongestion, and to reduce travel time. The project provides interstate connectivity between Uttar Pradesh- Uttarakhand -bypass connecting major economic centers of the region. It serves as a trade route for  India – Bangladesh, and India- Bhutan – Bangladesh. It will provide connectivity to Jim Corbett National Park.

The members of the Network Planning Group have further suggested certain components of integrated planning and synchronized implementation concepts and have ensured faster clearance and support for the projects. Through PM GatiShakti NMP, it shall be possible to implement these projects in the coming years.

NPG has the head of Planning Divisions of the infrastructure Ministries including, the Ministry of railways, MoRTH, Power, MoPNG, DoT, MoCA, MoPSW, Transport department, Ministry of Ports, Waterways, PwD, PSU, PMT, DS SM & PPP  with a special representative from NITI Aayog and MoEF&CC. Logistics Division, DPIIT functions as the secretariat of PM GatiShakti

Also see – INDIA’S MERCHANDISE TRADE: Preliminary Data of September 2022

34chelcee40

Recent Posts

IBM Q2D Launches the IBM Global Entrance Test (GET), for Postgraduate Programs at Top Universities Across India for the 2025-26 Academic Year

IBM Q2D launches the IBM Global Entrance Test for students who wish to pursue their…

5 hours ago

Setting a New Record: 10,000+ Students Join Aakash Educational Services Limited – The Home of Problem Solvers

Welcoming the next generation of Problem Solvers to a guided, result-oriented academic journeyMore students and…

5 hours ago

VinFast’s Premium EVs Deliver Segment-Leading Features for Indian Roads

Electric cars are finally making sense for Indian drivers. They're cleaner, sure. But more importantly,…

6 hours ago

7UP Makes You Feel Super Duper Refreshed to Beat the Summer Heat

As temperatures rise during the hottest weeks of the year, 7UP is bringing new flavours…

6 hours ago

HighLevel Brings More than 1000 Global Team Members Together for Landmark Retreat in the Maldives

HighLevel, the AI-powered all-in-one platform built for agencies, marketers, and entrepreneurs, is bringing more than…

6 hours ago

ACE Verde Fully Sold Out, Strengthening Investor Trust in ACE Group’s Yamuna Expressway Portfolio

Reaching yet another milestone in its growth trajectory, ACE Group has announced that its luxury…

6 hours ago