National News

Union Power Minister lays foundation stone for construction of LILO of Kishenganj-Darbhanga

Union Power Minister lays foundation stone for construction of LILO of Kishenganj-Darbhanga 400kV Transmission Line at Saharsa in Bihar

The project to improve power scenario of the Saharsaalong with Supaul, Khagaria and Begusarai districts

Low voltage problem of North Bihar expected to be solved

Posted On: 13 SEP 2020 6:52 PM by PIB Delhi

Shri R. K. Singh, the Union Minister of State(I/C) for Power and New & Renewable Energy, laid the foundation stone for the construction of LILO of Kishenganj-Darbhanga 400kV Transmission Line at Saharsa in Bihar through a virtual event. The execution agency for the ₹ 100 crores worth project is POWERGRID Ltd., a central PSU under the Ministry of Power.

While praising the Powergrid for its efforts Shri Singh said that the Maharatna has played important role in connecting every state and region with national grid, especially in Bihar. The inter-regional transmission systems have helped Bihar in accessingpower supply from other states at cheaper rates. He further said that on completion of the Kishenganj-Darbhanga 400kV Transmission Lineproject, Power scenario of the Saharsa district including Supaul, Khagaria and Begusarai districts shall improve. Low voltage problem of North Bihar will be considerably solved and above districts shall be benefited by reliable Power.

Saharsa is located in the extreme Northern part of Bihar and is a flood-prone area due to the inflow of water from Nepal. To improve the Power Scenario of the North Bihar area, one 400/220/132 kV substation is being established by POWERGRID at Saharsa. The Substation shall be connected with Patna and Kishenganj through 400 kV Kishanganj-Patna Line. Both Kishanganj and Patna are very far from Saharsa and the transmission line is vulnerable in nature due to so many critical river crossing locations. Central Electricity Authority (CEA) studied the Power Scenario of North Bihar and it has been decided to provide the additional connection for Saharsa 400 kV Substation with Darbhanga also. The same is planned to be achieved by the construction of the LILO of Kishanganj Darbhanga Line.

RCJ/M

(Release ID: 1653854) Visitor Counter: 100

Also See:

newsonline

Recent Posts

Malaysia Airlines and Tourism Malaysia Collaborate to Organise an Exciting Event at Nexus Mall, Amritsar

Malaysia Airlines, in collaboration with Tourism Malaysia, is thrilled to announce an exciting event at…

17 hours ago

StockGro and The Economic Times Announce Strategic Partnership to Empower Indian Investors

In a significant development in the financial education landscape, StockGro, Indias leading social investment platform,…

17 hours ago

Malaysia Madani Carnival 2024: A Resounding Success in New Delhi

The High Commission of Malaysia in India, is pleased to announce the successful conclusion of…

17 hours ago

Technology Firm I Square Tek Sets Up India Offshore Development Centre for HPE Aruba Networking in Bengaluru

The Offshore Development Centre will run global network support operations and cyber security services for…

18 hours ago

Explore Diverse Home Financing Options on Bajaj Markets

A wide range of home loan options are available on Bajaj Markets that can help…

18 hours ago

“Dost Banke” – The Indian Music Video That’s Making the World Cry

The musical masterpiece, "Dost Banke" has gotten an overwhelming response from the audience, moving viewers…

18 hours ago